Project Estimate
Client Name: Gary A
Location: Auburn, WA
Scope of Work: Bathroom 1 Remodel , Powder Room Remodel , Bathroom 2 Remodel , Master Bathroom Remodel, Kitchen Remodel, New Patio with Roof.
Bathroom 1 Remodel
SCOPE OF WORK
Preparation and Demolition:
Remove wall paper, floor (if replacing floor with tile) , baseboards, toilet, vanity, mirror. Responsible for debris disposal and taking protective measures for the rest of the house during the project.
Rough-In, Electrical, and Plumbing
Vanity Wall: Prepare the wall to accommodate a new floating vanity with drawers
Electrical: Adjust/install wall lights per plan. Adjust / Install two recessed ceiling lights per plan . For Option1 smart toilet outlet is required - see specs on the website.
Plumbing:
- Keep existing plumbing. Install new toilet. Option 1,2 - check for size & footprint.
- Install new floating vanity with sink ( 30" or same size as existing) and faucet. Use H 3" protective quarts back splash for vanity
Finishing
Floor:
Option1: Remove existing floor, Install tile - 30sf (+$800)
Option 2: Keep existing Floor
Walls and Ceiling
Prepare wall surface: joint compound to fill any holes or cracks in the wall after removing wallpaper. Or apply a "skim coat" to create a smooth, uniform surface.
Accent Wall: Install Shiplap wall planks, width 7"
Paint: Primer + 2 coats of paint Walls and ceiling, Install baseboards. Paint is included
Toilet: Install Option 1 or Option 2 Toilet (see below)
Vanity: Install vanity and faucet with protective 3" quarts back splash.
Lighting: Install wall lights above the vanity, Mirror and Accessories
Materials. Proposed Finishing Materials to order
(click on the image)
Cost before tax (Labor + Rough Material) :
Option 1: $5000- Keep the floor, Base Toilet: Option 2
Option 2: $5850 - Keep the floor, Toilet: Option 1
Option 3: $6600 - Tile the Floor, Toilet: Option 1
Included: Labor and Rough Materials
Project Duration: 5-6 business days.
Included Warranty: 3 years
-----------------------------------------------------
Suggested Finished Material:
Option 1: $1940 - with exiting floor and Base Option 2 Toilet
Option 2: $3110- with exiting floor and Option 1 Toilet
Option 3: $3400 - with tiles and Option 1 Toilet
----------------------------------------------------------------------------------
TOTAL COST: (Labor, Rough Material, Finished Material)
Cost before tax
Option 1: $6940 - with exiting floor and Base Option 2 Toilet
Option 2: $8960- with exiting floor and Option 1 Toilet
Option 3: $10000 - with Tiles and Option 1 Toilet
Bathroom 2 Remodel
SCOPE OF WORK
Preparation and Demolition:
Protect adjacent areas from dust and debris.
Disconnect and cap plumbing and electrical connections as needed.
Remove existing tile from the floor. Remove existing bathtub, vanity, toilet, flooring, wall finishes, and any accessories.
Demolish the wall with door to create an open space, ensuring structural integrity and compliance with code.
Dispose of all demolition debris and clean up the work area.
Framing and Modifications
Frame and prepare new shower area (38"/40" x 60"). Adjust framing as required after wall removal. Ensure proper backing and support for tile installation, shower niche, and floating vanity.
Plumbing
Reconfigure plumbing lines for new shower drain, shower valve, and fixtures. Cap and reroute plumbing as needed for the floating vanity and toilet. Install new shower valve, shower head, and all required fittings.
Electrical
Modify electrical layout as needed after wall removal.
Install new light fixtures, vanity light, and outlets as needed.
Ensure all wiring complies with the electrical codes.
Shower Installation
Build 38" x 60" tiled shower with waterproof membrane and slope-to-drain system.
Install tiled mosaic floor and tiled walls in shower area.
Build wide niche H 12" on the front shower wall with tile finish.
Install shower door or glass panel
Flooring
Prepare subfloor and install waterproof underlayment.
Install tile on entire bathroom floor with grout and sealing.
Fixtures and Accessories
Install 42" floating vanity (or vanity on legs) , mirror, and sink faucet.
Install new toilet.
Install bathroom accessories (towel bar, paper holder, hooks, etc.).
Painting and Finishing
Prepare and paint walls and ceiling.
Perform caulking, touch-ups, and final detailing.
Clean all surfaces and remove construction debris.
Materials. Proposed Finishing Materials to order
(click on the image)
Cost before tax (Labor + Rough Material) : $14800
Included: Labor and Rough Materials
Project Duration: 5-6 business days.
Included Warranty: 3 years
This quote includes labor and rough materials.
Customer is responsible for selecting and providing all finished materials (tiles, vanity, fixtures, accessories, paint, etc.).
AD Master Construction will handle pickup, transportation, and delivery of all customer-supplied materials to the job site.
Any deviations from the above scope of work or additional changes will require a change order and may affect the project cost or completion time.
-----------------------------------------------------
Suggested Finished Material: $5014
Based on the list Above
----------------------------------------------------------------------------------
TOTAL COST: (Labor, Rough Material, Finished Material) - $19814
Cost before tax
Attached Patio with Roof (Approx. 256" x 220")
SCOPE OF WORK
1. Project Overview
Construct a new attached patio structure connected to the existing house, including a roof system and a reinforced concrete slab foundation. All work will be completed in compliance with local building codes and permitting requirements.
2. Site Preparation
- Removal of the existing Concrete, Removal of the stump and roots. Protect existing structures, landscaping, and utilities.
- Clear vegetation, debris, and any obstacles from the work area.
- Excavate as required for concrete slab foundation.
3. Concrete Slab Foundation
- Excavate to required depth per engineering specifications.
- Install gravel base and compact.
- Install reinforcement (rebar or welded wire mesh) as required.
Pour and finish concrete slab to smooth, broom, or specified finish.
- Allow proper curing time.
-----------------------------------------------
$5500
4. Patio Roof Structure
- Tie new patio roof structure into the existing house framing according to code.
- Install posts, beams, header, and supporting structural elements.
- Use pressure-treated lumber or engineered wood as required.
- Install rafters or trusses for the patio roof.
- Install roof sheathing, waterproofing underlayment, fascia, and trim.
- Match existing roof pitch and style where possible.
5. Roofing
- Install roofing materials to match or coordinate with existing house roof (composition shingles).
- Install flashing where patio roof connects to house.
- Install drip edge, ridge cap (if applicable)
6. Finishes
- Install soffits, fascia, and trim elements.
- Paint or stain all exposed wood surfaces
- Clean the job site and remove all construction debris.
-------------------------------------------------------------------
$20100
Cost before tax (Labor + Rough Material) : $25600
Included: Labor and Materials
Project Duration: 2-3 weeks
Included Warranty: 3 years
This quote includes labor and materials.
Exclusions (Unless Specifically Added)
- Architecture plan - $5000 (estimate) , HVAC plan
- Fireplace is not included. ( estimated $7000-$ 9000 depending on requirements and finishes )
- HVAC, GAZ heaters, installation not included
- Obtain required permits
Any deviations from the above scope of work or additional changes will require a change order and may affect the project cost or completion time.
-----------------------------------------------------