bathroom ZONE
A Helpful Checklist is key to defining your scope of work and knowing who will be doing what for your project. Each of these below areas makes up a basic kitchen remodel project budget.
Bathroom Remodeling Check List
This bathroom remodel checklist typically includes defining goals, planning the layout and design, setting a budget, selecting materials and fixtures. Then the construction phase begins: the demolition, plumbing, electrical, and installation phases, tiling, culminating in finishing touches and a final inspection.
One of the best ways to begin is a bathroom remodel checklist. This information helps you explore current products, materials giving you a foundation to identify your initial list of “must-haves.”
It’s important to clearly communicate your preferences, establish a budget, and discuss what matters most to you and your family to ensure the best results.
A well-organized checklist is essential to outlining your project’s scope and understanding who will be responsible for each aspect. The following categories represent the key components of a standard kitchen remodel budget.
Contractors Check List: Labor and Rough | Building Materials
- Demolition and site preparation/protection cost (labor, dump fees, garbage bin fees, etc.)
- Framing (labor, materials, if any new framing is required, or removing walls, etc.)
- Plumbing (labor, include rough-in materials like pipes, new lines and fittings)
- Electrical changes (labor, include materials like wiring, electrical boxes, heated flooring materials, thermostats, Switches, plugs, cover plates etc.)
- Drywall, prep a drywall patch for paint (labor, Drywall, plaster, materials)
- Tile preparation and waterproofing for a shower /bath tube area walls and floor (Waterproof Membrane, Cement Backer Board, Thin-Set Mortar, etc)
- Tile Installation Supplies (tile trim, thin set, grout, spacers, trowels, sponges, Grout Sealer, Caulk, etc)
- Floor underlayment (Kerdi)
- Paint, Caulk (labor, materials)
Clients Check List: Finishing Materials
- Fixtures: - Wall Vanity Lightings, Mirror with LED, LED in Shower Niche, Recessed LED Lighting for ceiling.
- Floor Air Vent, Ceiling Mounted Exhaust Fan, Towel warmer, Underfloor Heating Systems
- Shower Pan/ Base, Shower Drain
- Shower System with Shower Head, Hand Shower, Slide Bar, Shower Arm, Hose, Control Valve and Valve Trim
- Shower door/sliding door or shower glass
- Vanity, Vanity Hardware, Vanity top, Vanity faucet, Sink and Sink Drain
- Insert for the shower niche
- Tiles for the shower walls, niche and for shower floor (mosaic or small tiles)
- Tile for the bathroom main floor area (can be same as tiles for the shower walls or different)
- Door(s) (pocket door, entry door etc), Moulding (baseboards, crown molding, etc).
- Bathroom Accessories, Art/ Decor, Window Treatments
ORDERING: Once you are happy with the budget and the finishing materials, it’s time to start ordering. Some items can have long lead times and it’s best to get everything on site before we start. Some special order items might take 4 – 5 weeks after you order before they arrive. There are some things you can ultimately do a bit later, but if we work on your project please make sure we have everything we need to get things done without a delay.