CLIENT ZONE

Gabriel Rusenna

Gabriel Rusenna  - Deck Remodel, Kirkland

Client:  Gabriel Rusenna

Email:  Gabriel.Rusenna@gmail.com

Phone: +18506953198  Address: 10613 NE 138th PL Kirkland WA 98034 

Project Overview:   New Deck

PLAN

SCOPE OF WORK

Preparation and Demolition:

Remove existing deck,

Rough-In, Electrical, Plumbing


Electrical work:

Re-positioning of electrics for  towel warmer, outlet - LED lights for niche, outlet for smart toilet, all  with GFI plugs.  Adding

 wall lamp above  the vanity.   Included additional GFI plug  near vanity if needed.


Plumbing:

   Smart Toilet Seat  installation, Remove existing vanity and sink and install new.  Install New shower System,  Check Drain,  Mixer. Prepare  for standard white base for the shower.

Finishing

Shower

Wall Tiling and Niche Tiling (LED):

  • Tile from floor to ceiling shower
  • Client wants big tiles for Floor and Decor
  • Shower floor: Pre-made white base

Waterproofing & Substrate:

  • Use cement board (or DensShield, Schluter Kerdi-Board, Wedi Board) for shower walls.

Shower Wall & Features:

  • Build a back shower wall with a recessed niche.
  • Shower Partition : Frameless sliding glass partition, no door , 30" W x 76" H -  ready made from home depot


Toilet Selection:

  • Smart seat toilet, GFI plug.


Bathroom Floor

Tile the floor -  client wants the same tiles as for the shower walls

Vanity Unit:

  • 36" shaker-style vanity with legs  and countertop (provided by client). Sink provided by client. Install faucet. 3 " quarts  backsplash.

Niche above vanity :  create custom / open niche for recessed medicine cabinet   with mirror. re-enforce. Put/ install mirror cabinet 


Left Side Existing niche :  Put towel warmer with  outlet


Bathroom Accessories

Install  bathroom accessories (towel bar, robe hook, toilet paper holder, etc.).

Paint:

  • Walls- patch where needed, prepare for paint. ceiling, -  including skylight area. Baseboards -  3", paint, installed


Lighting:

Install wall lighting above vanity

Cost before tax :  $12,000


Included:  Labor and Rough Materials

Project Duration:  8-10  business days

If paid by Credit card: transaction fee 50/50

Included Warranty:  3 years