CLIENT ZONE

Malyn Lagbas

Mylyn Lagbas  - Bathroom Remodel, Seatac

Client:  Mylyn Lagbas

Email:  mylynlagbas@yahoo.com

Phone: 786-498-2205

Project Overview:  This renovation involves a full upgrade of the bathroom, including total demolition, converting bath tube to a walk-in shower installation, new toilet and vanity setup, updated flooring, accessories, lighting, and paint.  Bathroom has skylight.   Extra features:   Towel Warmer, Full  tiled shower niche  with LED lighting, New Shower System, Niche above the toilet for medicine cabinet, niche above vanity for mirror medicine cabinet. All finish materials supplied by client.

PLAN

SCOPE OF WORK

Preparation and Demolition:

Remove floor, bath tube and tube  enclosure, all cabinets, vanity, check subfloor and wall near toilet for mold,  remove toilet. If mold, remove part of subfloor, replace with new one.  Wall -  remove  wall near toilet. Check for mold in the walls.

Rough-In, Electrical, Plumbing


Electrical work:

Re-positioning of electrics for  towel warmer, outlet - LED lights for niche, outlet for smart toilet, all  with GFI plugs.  Adding

 wall lamp above  the vanity. Recessed  light on the ceiling.  Included additional GFI plug  near vanity


Plumbing:

   Smart Toilet  installation, Remove existing vanity and sink and install new.  Install New shower System,  Check Drain,  Mixer. Prepare  for Pre-made base for the shower

Finishing

Shower

Wall Tiling and Niche Tiling (LED):

  • Tile from floor to ceiling shower
  • Client wants big tiles for Floor and Decor:  30"x60"
  • Shower floor: Pre-made white base

Waterproofing & Substrate:

  • Use cement board (or DensShield, Schluter Kerdi-Board, Wedi Board) for shower walls.

Shower Wall & Features:

  • Build a back shower wall with a recessed niche.
  • Shower Partition : Frameless sliding glass partition, no door , 30" W x 76" H -  ready made from home depot


Toilet Selection:

  • Smart toilet, GFI plug, Elongated, chair-height.



Bathroom Floor

Tile the floor -  client wants the same big tiles as for the shower walls

Vanity Unit:

  • 36" shaker-style vanity with legs  and countertop (provided by client). Sink provided by client. Install faucet


Right Side New Niche above vanity :  create custom / open niche for recessed medicine cabinet   with mirror. re-enforce. Put/ install mirror cabinet 


Left Side Existing niche :  Put towel warmer with  outlet


Bathroom Accessories

Install  bathroom accessories (towel bar, robe hook, toilet paper holder, etc.).

Paint:

  • Walls, ceiling, skylight to be painted  -  including skylight area. Baseboards -  3", paint, installed


Lighting:

  • Wall Lighting above vanity, 1 -2 recessed lights


Cost before tax :  $12,500


Included:  Labor and Rough Materials

Project Duration:  8-10  business days

Included Warranty:  3 years