Project Estimate

Client Name: Garret |Bathroom Remodel, Kitchen Remodel, Flooring

Location: Seattle

This renovation involves a full upgrade of the bathroom, including converting bath tube to the shower, new shower installation ,  new vanity, new toilet, tiling,  accessories,  and paint.    Kitchen remodeling including  new cabinet and countertop installation. Changing carpet  to floor in the living room.

SCOPE OF WORK

Preparation and Demolition:

Remove floor (carpet) in the living room, floor in the kitchen and bathroom,   bath tube, bath enclosure, tiles in the bathroom ,  toilet, vanity cabinet, toilet, vanity.  Remove  big mirror Remove kitchen cabinets and countertop. Dispose. 

Cost before tax for Demolition : $2,000

------------------------------------------------------------------------------

Project 1 Complete Bathroom Remodel


Bathroom -  convert bath tube to shower,   pre-made base for shower, tile shower area up to ceiling,  install new shower system, tile floor, install  shower sliding door, install new toilet  toilet, install new  vanity, new faucet, remove  big mirror, change to new  modern  mirror , install new lighting on the wall, paint walls and ceiling


 Cost before tax : $9,000   Included:  Labor and Rough Materials. 

Estimated Finishing Materials $4000

Estimated Total: $13,000 before tax


------------------------------------------------------------------------------------


Project 2 Complete Kitchen Remodel


Assemble and Install  new kitchen cabinets   + install quarts  countertop  (cost for the kitchen cabinets  and quarts  separately )  Install back splash -  tile  up to wall cabinets, install trims   Put back appliances -  stove, fridge, dishwasher, faucet 


Cost before tax : $5000  Included:  Labor and Rough Materials

+ Estimated  Material: Premade cabinets,  quarts countertop, undermount sink, faucet, backsplash tiles:  $7000

Estimated Total: $12,000 before tax

-------------------------------------------------------------------------------------


Project 3:   Change carpet floor to LVP 
Prepare subfloor. Change floor to LVP flooring in  kitchen area + adjusted living  (total 600sf),


Cost before tax : $1200    Included:  Labor and Rough Materials.

+ Estimated  Material: LVP floor $1200

Estimated Total: $2,400 before tax



Project 4: Paint living room and kitchen walls, re-install baseboards

Paint walls in living room and kitchen, re-install baseboards

Cost before tax : $1200    Included:  Labor, Rough Materials, paint

Estimated Total: $1200 before tax

--------------------------------------------------------------------------------------------

TOTAL FOR ALL 4 PROJECTS INCLUDING LABOR and ROUGH MATERIALS: $18.900


TOTAL FOR ALL 4 PROJECTS INCLUDING LABOR, ROUGH MATERIALS AND FINISHING MATERIALS: $28.600 (estimated cost, depends on the finishing material cost you choose)

 


MATERIAL LIST


Shower System with mixer


Delta Modern 1-Spray Raincan Wall Mount Fixed and Handheld Shower Head 1.75 GPM in Matte Black   


  Shower Glass Panel

34 in. W x 78 in. H Single Panel Radius Fixed Frameless Shower Door


Shower Pan

32 in. W x 60 in. L x 1.125 in. H Alcove Solid Composite Stone Shower Pan Base with L/R Drain in White Sand



Bathroom Faucet

Delta Sandover Pulldown Matte Black Widespread 2-handle  Bathroom Sink Faucet with Drain

Lefton Single-Hole Rotatable Faucet with Temperature Display

Lefton Two-Handle Widespread Waterfall & Pull-Out Bathroom Faucet with Temperature Display



Vanity

Lawford 36 in. Single Sink Freestanding Fluted Baltic Birch Bath Vanity with Carrara White Engineer Stone Top



Smart Toilet

Tankless Elongated Smart Toilet Bidet in White T03 with Auto Open, Auto Close, Auto-Flush, UV Sterilization, Remote


Tile

Bellevue Porcelain Tile 24X48



Mirror Vanity


Vanity Lighting

Bektas Wall Sconces, Set of 2, Matte Black


LED Ceiling light

Feit Electric 75W Replacement 5-CCT LED Recessed Downlight 8PK



Valve and Valve Trim

Shower door/sliding door or shower glass

Vanity,  Vanity Hardware, Vanity top, Vanity faucet, Sink and Sink Drain

Insert for the shower niche

Tiles for  the shower walls,  niche  and  for shower floor  (mosaic or small tiles)

Tile for the bathroom main floor area (can be same as tiles for the shower walls or different)

Door(s) (pocket door, entry door etc), Moulding (baseboards, crown molding, etc).

 Bathroom Accessories, Art/ Decor, Window Treatments