Complete Bathroom Remodel
SCOPE OF WORK: Check for the mold. If it is localized only in the shower area replace the subfloor only in this area. If it is spread check, replace accordingly
Preparation and Demolition:
Remove all tiles. podium, bath tube, vanity, baseboards, mirror.
Finishing
Floor - one level, remove podium:
Option1: LVP
Option 2: Tile
Shower Area:
Keep Pony wall on the shower right - for shower glass support - see images below to use the same glass as before
Wide Niche on the front wall
Tiles - up to ceiling
Bath tube Area:
Remove all existing. Replace with stand alone Bath tube. Put niche on the right wall. Put tile up to ceiling around window , to be continuous with front shower wall
Paint: Primer + 2 coats of paint Walls and ceiling, Install baseboards.
Vanity: Install vanity and faucet with protective 3"-4" quarts back splash.
Lighting: Install wall lights in 2 sides of vanity, 2 Mirrors and Accessories