bathroom ZONE

A Helpful Checklist is key to defining your scope of work and knowing who will be doing what for your project. Each of these below areas makes up a basic kitchen remodel project budget.

Bathroom Renovation Material List

The bathroom remodel material checklist typically includes defining goals, planning the layout and design, setting a budget, selecting materials and fixtures. Then the construction phase   begins:  the demolition, plumbing, electrical, and installation phases, tiling, culminating in finishing touches and a final inspection. 

One of the best ways to begin is  a bathroom remodel checklist. This information helps you explore current products, materials giving you a foundation to identify your initial list of “must-haves.”

It’s important to clearly communicate your preferences, establish a budget, and discuss what matters most to you and your family to ensure the best results.

A well-organized checklist is essential to outlining your project’s scope and understanding who will be responsible for each aspect. The following categories represent the key components of a standard kitchen remodel budget.


Contractors Check List:  Labor and  Rough | Building Materials

  • Demolition and site preparation/protection cost (labor, dump fees, garbage bin fees, etc.)
  • Framing (labor, materials, if any new framing is required, or removing walls, etc.)
  • Plumbing (labor, include rough-in materials like pipes, new lines and fittings)
  • Electrical changes (labor, include materials like wiring, electrical boxes, heated flooring materials, thermostats, Switches, plugs, cover plates etc.) 
  • Drywall, prep a drywall patch for paint   (labor,  Drywall, plaster, materials)
  • Tile preparation and waterproofing for a shower /bath tube area walls  and floor (Waterproof Membrane, Cement Backer Board, Thin-Set Mortar, etc)
  • Tile Installation Supplies (tile trim, thin set, grout, spacers, trowels, sponges, Grout Sealer, Caulk, etc)
  • Floor underlayment (Kerdi)
  • Paint, Caulk (labor, materials)


Clients Check List:  Finishing  Materials


Shower System with mixer


Delta Modern 1-Spray Raincan Wall Mount Fixed and Handheld Shower Head 1.75 GPM in Matte Black   


  Shower Glass Panel

34 in. W x 78 in. H Single Panel Radius Fixed Frameless Shower Door


Shower Pan

32 in. W x 60 in. L x 1.125 in. H Alcove Solid Composite Stone Shower Pan Base with L/R Drain in White Sand



Bathroom Faucet

Delta Sandover Pulldown Matte Black Widespread 2-handle  Bathroom Sink Faucet with Drain

Lefton Single-Hole Rotatable Faucet with Temperature Display

Lefton Two-Handle Widespread Waterfall & Pull-Out Bathroom Faucet with Temperature Display

Vanity

Lawford 36 in. Single Sink Freestanding Fluted Baltic Birch Bath Vanity with Carrara White Engineer Stone Top


Towel Warmer

Electric Towel Warmer Wall Mount Heated Towel 12 Bars Plug in Hardwired Black


Smart Toilet

Tankless Elongated Smart Toilet Bidet in White T03 with Auto Open, Auto Close, Auto-Flush, UV Sterilization, Remote


Tile

Bellevue Porcelain Tile 24X48



Mirror Vanity


Vanity Lighting

Bektas Wall Sconces, Set of 2, Matte Black


LED Ceiling light

Feit Electric 75W Replacement 5-CCT LED Recessed Downlight 8PK


Exhaust Fan

Broan-NuTone VC110CCT Smart Exhaust Fan 13.25"x13.25"x5.75"



Valve and Valve Trim

Shower door/sliding door or shower glass

Vanity,  Vanity Hardware, Vanity top, Vanity faucet, Sink and Sink Drain

Insert for the shower niche

Tiles for  the shower walls,  niche  and  for shower floor  (mosaic or small tiles)

Tile for the bathroom main floor area (can be same as tiles for the shower walls or different)

Door(s) (pocket door, entry door etc), Moulding (baseboards, crown molding, etc).

 Bathroom Accessories, Art/ Decor, Window Treatments


ORDERING: Once you are happy with the budget and the finishing materials, it’s time to start ordering. Some items can have long lead times and it’s best to get everything on site before we start. Some special order items might take 4 – 5 weeks after you order before they arrive. There are some things you can ultimately do a bit later, but if we work on your project please  make sure we have everything we need to get things done without a delay.