Sally N

Sally N  - Bathroom Remodel, Kirkland

Client:  Sally N

Email: 

Phone: 206-422-8022

Project Overview:  This renovation involves a upgrade of the 2 bathrooms, including  demolition, new shower and  new bath tube

BATHROOM 1 with shower

PLAN

SCOPE OF WORK

Preparation and Demolition:

Remove shower enclosure and Glass. Re-install toilet and vanity  to prepare for LVP flooring

Rough-In, Electrical, and Plumbing


Shower Niche with insert:

  • Create a shower niche with insert  centered, for insert : 12"x 24"

 

Shower Plumbing:

  • Install new shower system with mixer.
  • Pre-made base  from home depot 33X33


Finishing

Waterproofing & Substrate:

  • Use cement board with a waterproofing guard  for shower
  • Use  shower base 33X33 from Home Depot


Shower Wall Tiling

  • Tile the shower  area  33"x33 "walls, niche insert  for 12X2, no niche tiling
  • Standard size tile
  • Install  glass door, 33"


Bathroom Floor:

  •   Remove toilet, remove vanity, put LVP floor and  baseboards. Install toilet and vanity.


Cost before tax :  $7,800


Included:  Labor and Rough Materials. All the finished Materials supplied by Client.

Hidden or unforeseen issues.  If, during the renovation, any hidden or unforeseen issues are discovered that are not included in the agreed scope of work, the client shall be responsible for any additional costs required to address them.

Project Duration:  7-8  business days

Included Warranty:  3 years

 CLIENT LIST OF MATERIALS:

 Client is responsible  for finishing materials: tiles for shower wall, shower acrylic base,  insert for niche, shower system  (Mixer, Rain Shower Head with Hand Shower ), shower glass door with accessories, LVP flooring.  ,

BATHROOM 2-with bath tube

PLAN

SCOPE OF WORK

Preparation and Demolition:

Remove bath tube,   enclosure. Re-install toilet and vanity  to prepare for LVP flooring

Rough-In, Electrical, and Plumbing


Bath tube:

  • Install the new bath tube, same drain location


Electrical:

  • No electrical


Plumbing:

  • Install new shower system, maintaining the existing drain location.
  • Install toilet as before
  • Install vanity as before

Tiling

  • Tile the bath tube area walls
  • Insert for niche : 12x24, no tiling .  insert  centered, for insert : 12"x 24" Standard size tile


Waterproofing & Substrate:

  • Use cement board with a waterproofing guard  on all bathtub area walls.  Install new bath tube



Bathroom Floor:

  • Remove toilet, remove vanity, put LVP floor and  baseboards. Install toilet and vanity

Cost before tax :  $7,800


Included:  Labor and Rough Materials. All the finished Materials supplied by Client.

Hidden or unforeseen issues.  If, during the renovation, any hidden or unforeseen issues are discovered that are not included in the agreed scope of work, the client shall be responsible for any additional costs required to address them.

Project Duration:  7-8  business days

Included Warranty:  3 years

 CLIENT LIST OF MATERIALS:

 Client is responsible  for finishing materials: tiles for bath tube walls, Bath tube with the same drain location,   insert for niche, shower system  (Mixer, Rain Shower Head with Hand Shower ),  LVP flooring. 

Grand Total Before tax for 2 Bathrooms:   $15,600

Sales Tax - $1,591.20

Grand Total after  tax for 2 Bathrooms:   $17,191.20


Bathroom1 - $7,800

Bathroom2 - $7,800

LIST OF MATERIALS

BATHROOM 1

BATHROOM 2

Bath tube

With the same drain location


Shower System

Shower System with Shower Head, Hand Shower, Shower Arm, Hose, Control Valve and Valve Trim


Tiles

Tiles for walls

Insert for niche


Floor

LVP for Floor

Shower base

33X33, With the same drain location


Shower System

Shower System with Shower Head, Hand Shower, Shower Arm, Hose, Control Valve and Valve Trim


Tiles

Tiles for walls

Insert for niche


Floor

LVP for Floor